**RCOS — Regenerative Community Operating System**

# Operations Manual

- **Generated:** 2026-11-06
- **Source (latest version):** [https://rcos.ecohubs.community/articles/rcos-templates/layer-5/operations-manual](https://rcos.ecohubs.community/articles/rcos-templates/layer-5/operations-manual)
- **All RCOS templates:** [https://rcos.ecohubs.community/articles/rcos-templates](https://rcos.ecohubs.community/articles/rcos-templates)

---
- **Layer:** 5 — Operations & Coordination
- **Status:** Template — adapt for your community
- **RCOS reference:** [§7.1](https://rcos.ecohubs.community/standard/core/0.1/layer-5-operations-coordination#7.1), [§7.3](https://rcos.ecohubs.community/standard/core/0.1/layer-5-operations-coordination#7.3), [§7.4](https://rcos.ecohubs.community/standard/core/0.1/layer-5-operations-coordination#7.4), [§7.5](https://rcos.ecohubs.community/standard/core/0.1/layer-5-operations-coordination#7.5), [§7.6](https://rcos.ecohubs.community/standard/core/0.1/layer-5-operations-coordination#7.6)

> Describes how day-to-day work gets done: the core processes, ad-hoc responsibilities, how roles hand work to each other, workload limits, continuity when people are away, and where the documentation lives.

---

## Core Operational Processes

*RCOS clauses: [7.3.4](https://rcos.ecohubs.community/standard/core/0.1/layer-5-operations-coordination#7.3.4), [7.7.2](https://rcos.ecohubs.community/standard/core/0.1/layer-5-operations-coordination#7.7.2), [7.6.3](https://rcos.ecohubs.community/standard/core/0.1/layer-5-operations-coordination#7.6.3)*

| Process | Who | Detail |
|---|---|---|
| _<Member onboarding>_ | _<role>_ | _<see Onboarding Protocol (Layer 1)>_ |
| _<Member exit>_ | _<role>_ | _<see Exit & Separation Protocol (Layer 1)>_ |
| _<Proposal publication>_ | _<role>_ | _<see Governance Protocol (Layer 2)>_ |
| _<Contribution recording>_ | _<role>_ | _<see Internal Economy Protocol (Layer 3)>_ |
| _<Recurring meeting>_ | _<facilitator>_ | _<agenda publication; notes; action tracking>_ |
| _<Treasury management>_ | _<finance steward>_ | _<see Treasury Ruleset (Layer 3)>_ |
| _<Platform access review>_ | _<infrastructure steward>_ | _<review cadence; access revocation for exited members>_ |

## Temporary and Ad-Hoc Responsibilities

*RCOS clauses: [7.1.5](https://rcos.ecohubs.community/standard/core/0.1/layer-5-operations-coordination#7.1.5), [7.1.4](https://rcos.ecohubs.community/standard/core/0.1/layer-5-operations-coordination#7.1.4), [7.7.1](https://rcos.ecohubs.community/standard/core/0.1/layer-5-operations-coordination#7.7.1)*

When a task or responsibility is assigned temporarily, it must be:

- _<Explicitly time-bounded from the outset (specific end date or completion condition).>_
- _<Documented as temporary at the time of assignment.>_
- _<Reviewed before the end date; converted to a formal role or terminated.>_

_<Maximum duration of any temporary responsibility before it must be formally assigned or terminated — e.g. 90 days.>_ If a temporary responsibility has no owner after its end date, it lapses; it does not transfer implicitly.

---

## Role and Domain Interfaces

*RCOS clauses: [7.6.3](https://rcos.ecohubs.community/standard/core/0.1/layer-5-operations-coordination#7.6.3), [7.3.4](https://rcos.ecohubs.community/standard/core/0.1/layer-5-operations-coordination#7.3.4)*

| From | To | Handoff |
|---|---|---|
| _<role>_ | _<role>_ | _<what is handed off>_ |
| _<role>_ | _<role>_ | _<...>_ |

## Workload Boundaries

*RCOS clauses: [7.4.1](https://rcos.ecohubs.community/standard/core/0.1/layer-5-operations-coordination#7.4.1), [7.4.2](https://rcos.ecohubs.community/standard/core/0.1/layer-5-operations-coordination#7.4.2), [7.4.3](https://rcos.ecohubs.community/standard/core/0.1/layer-5-operations-coordination#7.4.3), [7.4.4](https://rcos.ecohubs.community/standard/core/0.1/layer-5-operations-coordination#7.4.4), [7.7.3](https://rcos.ecohubs.community/standard/core/0.1/layer-5-operations-coordination#7.7.3)*

- **Meeting load:** _<recurring meeting cadence and maximum duration; rules for extraordinary meetings.>_
- **Role load:** _<cap if any; rule for flagging overload; resolution window.>_
- **Response time expectations:** _<non-urgent async; urgent operational; safety-critical.>_
- **Renegotiation and relief:** _<process for redistributing responsibilities; resolution window.>_
- **Persistent overload:** _<how persistent overload, burnout risk, chronic non-participation, or dependency on over-functioning individuals is detected, and how it is routed into the Layer 4 review or repair process.>_

## Operational Continuity

*RCOS clauses: [7.5.1](https://rcos.ecohubs.community/standard/core/0.1/layer-5-operations-coordination#7.5.1), [7.5.2](https://rcos.ecohubs.community/standard/core/0.1/layer-5-operations-coordination#7.5.2), [7.5.3](https://rcos.ecohubs.community/standard/core/0.1/layer-5-operations-coordination#7.5.3)*

- **Current state:** _<honest list of single points of failure; recruitment plan to reduce concentration.>_
- **Handover mechanisms:** _<reference handover requirements per role in the Role Registry; handover must be completed before a role is vacated.>_
- **Continuity review cadence:** _<quarterly; ad hoc on role change.>_

## Information Flow and Anti-Gatekeeping

*RCOS clauses: [7.3.5](https://rcos.ecohubs.community/standard/core/0.1/layer-5-operations-coordination#7.3.5), [7.7.4](https://rcos.ecohubs.community/standard/core/0.1/layer-5-operations-coordination#7.7.4), [7.3.2](https://rcos.ecohubs.community/standard/core/0.1/layer-5-operations-coordination#7.3.2)*

- _<Governance decisions accessible to all Full Members.>_
- _<Meeting notes published within X hours.>_
- _<Membership state and role assignments accessible.>_
- _<Contribution records accessible.>_
- _<Information request response window.>_
- _<Withholding access to information members are entitled to is an accountability trigger under Layer 4.>_
- _<No role or individual may be the sole point of access for information required by other role holders.>_

---

## Documentation Locations and Update Procedures

*RCOS clauses: [7.3.1](https://rcos.ecohubs.community/standard/core/0.1/layer-5-operations-coordination#7.3.1), [7.3.2](https://rcos.ecohubs.community/standard/core/0.1/layer-5-operations-coordination#7.3.2), [7.3.3](https://rcos.ecohubs.community/standard/core/0.1/layer-5-operations-coordination#7.3.3), [7.6.3](https://rcos.ecohubs.community/standard/core/0.1/layer-5-operations-coordination#7.6.3), [7.8.1](https://rcos.ecohubs.community/standard/core/0.1/layer-5-operations-coordination#7.8.1)*

| Document type | Location | Owner | Review cadence |
|---|---|---|---|
| _<RCOS artifacts>_ | _<location>_ | _<owner>_ | _<cadence>_ |
| _<Member registry>_ | _<location>_ | _<owner>_ | _<cadence>_ |
| _<Meeting notes>_ | _<location>_ | _<owner>_ | _<cadence>_ |
| _<Governance proposals>_ | _<location>_ | _<owner>_ | _<cadence>_ |
| _<Contribution records>_ | _<location>_ | _<owner>_ | _<cadence>_ |

---

## Ratification Record

- **Adopted:** <YYYY-MM-DD>
- **Decision type:** Strategic
- **Version:** <version>
- **Decision record:** <link to decision record>
